During modernization process, Electric Power Industry of Serbia (EPS) has given special attention to environmental projects.

Since 2009 through reconstruction or replacements of existing ash slurry systems, Goša Montaža took part in all projects of this kind erecting more than 3500 tons of steel structures, silo, pipelines and equipment.

Projects realized:

TENT B,  Obrenovac

TE KO B, Drmno  

TENT,     Kolubara A5 

In cooperation with German company Clyde Bergeman Drycon, Ash slurry Replacement System Project is in progress at the moment in Thermal power plant TEKO A. Goša Montaža is involved through design elaboration, production and erection of steel structure and equipment, electrical, civil engineering.