Ser.No

CONSTRUCTION

INVESTOR

YEAR

TE KOSTOLAC
  1.  
Dismounting and mounting of furnace flue of block 210 MW TEKO “A” TE KOSTOLAC 2003.
  1.  
Overhaul of Blok B1& B2 TE KOSTOLAC 2003.
  1.  
Overhaul of boiler plant of Blok 210 MW TE KOSTOLAC 2003.
  1.  
Dismounting of old and mounting of new flues for AERO-MIX no 5 & 7 TE KOSTOLAC 2003.
  1.  
Installation of pneumovibrators on overhaul of block B2 in TEKO “B” TE KOSTOLAC 2003.
  1.  
Reconstruction of reloading bridge in transporter A2 B TE KOSTOLAC 2004.
  1.  
Overhaul of air system and furnace flues in TEKO “A” TE KOSTOLAC 2004.
  1.  
Overhaul of coal transportation system in TEKO “A” TE KOSTOLAC 2004.
  1.  
Overhaul of block 210 MW in TEKO “A” TE KOSTOLAC 2004.
  1. 10.  
Ovehaul of RZV,VDG,VSV TE KOSTOLAC 2005.
  1. 11.  
Overhaul of boiler 5 of block 100 MW TE KOSTOLAC 2005.
  1. 12.  
Overhaul of electric filter TE KOSTOLAC 2005.
  1. 13.  
Overhaul of RZV TE KOSTOLAC 2005.
  1. 14.  
Overhaul of mills TE KOSTOLAC 2005.
  1. 15.  
Overhaul of fans and flues of block 210 MW TE KOSTOLAC 2005.
  1. 16.  
Dismounting and reerection of honeycomb structure in overhaul of RZV TE KOSTOLAC 2005.
  1. 17.  
Overhaul of rost TE KOSTOLAC 2005.
  1. 18.  
Erection of electric filter TE KOSTOLAC 2005.
  1. 19.  
Installation of electromagnetic metal separators on transporters A2a & A2b towards tilted coal bridge. TE KOSTOLAC 2006
  1. 20.  
Dismounting and erection of el. filter of boiler 2 block 1 TE KOSTOLAC 2006.
  1. 21.  
ZVVZa.s.Reconstruction of electrostatic precipitator (ESP) A 2. TE KOSTOLAC 2006.
  1. 22.  
Spray system reconstruction TE KOSTOLAC 2007.
  1. 23.  
Production and erection of furnace flues TE KOSTOLAC 2007.
  1. 24.  
Overhaul of deslagging unit B1& B2 TE KOSTOLAC 2007.
  1. 25.  
Overhaul of coal transportation line B1& B2 TE KOSTOLAC 2007.
  1. 26.  
Replacement of ash ducts TE KOSTOLAC 2007.
  1. 27.  
DOBERSEK GmbH-TE-KO B-delivery, tansport and erection of steel structure and steel silos for ash disposal system. TE KOSTOLAC 2007.
  1. 28.  
Overhaul RZV  in Unit B 2. TE KOSTOLAC 2008
  1. 29.  
Replacement of hot cells. TE KOSTOLAC 2008
  1. 30.  
Manufacture of steel pipe bridge structure M 1. TE KOSTOLAC 2008
  1. 31.  
Maintenance of steel structure. Bridge T1 to T8. TE KOSTOLAC 2009
  1. 32.  
Overhaul of mills, slurry channels, rec.channels –B1&B2 TE KOSTOLAC 2009
  1. 33.  
Overhaul/maintenance of fans & flue gas channels-A2 TE KOSTOLAC 2009
  1. 34.  
Maintenance of cranes & lifting devices TE KOSTOLAC 2009
  1. 35.  
DOBERSEK GmbH Contr. no – 1257 Erection of mechanical equipment & pipeline in concrete silo, production, transport and erection of supports. TE KOSTOLAC 2009
  1. 36.  
DOBERSEK GmbH Ug-1294 Delivery, transport & erection of steel roofs on silo in Kostolac V TPP (TEKO-B). TE KOSTOLAC 2009
  1. 37.  
Lining of slag steel silos in new system TE KOSTOLAC 2009
  1. 38.  
Reconstruction of ash handling system in  TE-KO A TE KOSTOLAC 2010
  1. 39.  
Overhaul of air channel flaps on A1 & A2 TE KOSTOLAC 2010.
  1. 40.  
Overhaul of mills on KAS, REC channels on B1 TE KOSTOLAC 2010.
  1. 41.  
Adaptation of Unit B2 with ESP reconstr. in TEKO B TE KOSTOLAC 2010.
  1. 42.  
Reconstruction of monoray tracks in mill boiler M-3 I M-4 TE KOSTOLAC 2010.
  1. 43.  
Dismont. of old and erection of new separators on mills TE KOSTOLAC 2010.
  1. 44.  
Capital overhaul of RZV. TE KOSTOLAC 2011.
  1. 45.  
Overhaul of hot  & cold air ducts with flaps and fans TE KOSTOLAC 2011.
  1. 46.  
Overhaul of  slag handling and sealing system TE KOSTOLAC 2011.
  1. 47.  
Alteration of excavator plant TEKO A2 TE KOSTOLAC 2011.
  1. 48.  
Ventilator & channels overhaul in gas/air unit in B1,B2 TE KOSTOLAC 2012
  1. 49.  
Ovrhaul of gratings and beds in TEKO B1 TE KOSTOLAC 2012.
KOP KOSTOLAC
  1. 50.  
DERICK  32/5MP crane overhaul KOP KOSTOLAC 2003
  1. 51.  
Reconstruction of distribution bunker and conveyor KOP KOSTOLAC 2003.
  1. 52.  
Erection of drive station B-2000 KOP KOSTOLAC 2003
  1. 53.  
Dismounting, reconstruciton and erection of reloading bridge equipment A2a KOP KOSTOLAC 2003
  1. 54.  
Dismounting and transport of one part of transport systema III BTO from KOP Ćirikovac to KOP Drmno KOP KOSTOLAC 2003
  1. 55.  
Overhaul of BTO system PO Ćirikovac & PO Drmno KOP KOSTOLAC 2003.
  1. 56.  
Mechanical erection within conveyor overhaul KOP KOSTOLAC 2003
  1. 57.  
Erection of dislocated transport system of III BTO system on KOP Drmno KOP KOSTOLAC 2003
  1. 58.  
Reconstruction, repair and erection of two drive stations with crawlers KOP KOSTOLAC 2004.
  1. 59.  
Revitalization of rotor excavator Srs 1300 no. 13 on PO Drmno KOP KOSTOLAC 2004
  1. 60.  
KOPEKS“S.A.- Construction of coal reception bunker of 1350t capacity and reconstruction of part of transport system for capacity of 9.000.000t/year. KOP KOSTOLAC 2005
  1. 61.  
Delivery and erection of bucket excavator SRs 2000 32/5.0 (2×670 kw) +VR92+/-10 made by TAKRAF. KOP KOSTOLAC 2006
  1. 62.  
Reconstruction of spraying system on A and C ash depot. KOP KOSTOLAC 2007
  1. 63.  
Repair of track support – installation of tie rods above fan SV Blok A 1. KOP KOSTOLAC 2007
TENT OBRENOVAC
  1. 64.  
Production and delivery of fan cases 6 DGS.. TENT OBRENOVAC 2003
  1. 65.  
Dismounting and erection of fan and mill cases. TENT OBRENOVAC 2003
  1. 66.  
Production of transport unit for hammering wheel axle, wall supporting moulding of mill hammer housing. TENT OBRENOVAC 2003
  1. 67.  
Welding on runner ring 35. Production and erection of insulation for mill housing 31-36, clutch dismonting and monting. TENT OBRENOVAC 2003
  1. 68.  
Erection of air ducts for afterburning grating, production of grinding tools for mill shaft journals 31,32,33,34,36. TENT OBRENOVAC 2003
  1. 69.  
Reconstruction of longitudinal conveyors 1 & 2. TENT OBRENOVAC 2003
  1. 70.  
Overhaul works on block A-6 mill no. 64 & 65 TENT OBRENOVAC 2004
  1. 71.  
Capital overhaul & rehabilitation TENT Blok A 5 TENT OBRENOVAC 2004
  1. 72.  
Overhaul of reinforcement in boiler part of blocks B1 TENT OBRENOVAC 2004
  1. 73.  
MITSUI BABCOCK-regenerative air heaters TENT OBRENOVAC 2004
  1. 74.  
Overhaul on mill in block  A-1& A2 TENT OBRENOVAC 2004
  1. 75.  
Runner overhaul N400 TENT OBRENOVAC 2004
  1. 76.  
MITSUI BABCOCK – Erection of flues in TENT Unit A 5 TENT OBRENOVAC 2005
  1. 77.  
Overhaul of coal bunker in blok A3 TENT OBRENOVAC 2005
  1. 78.  
Dismounting of old and erection of new el.filter A2 TENT OBRENOVAC 2005
  1. 79.  
Coal bunker repair works A2 TENT OBRENOVAC 2005
  1. 80.  
Repair of coal bunker A4-A9 TENT OBRENOVAC 2005.
  1. 81.  
Dismounting and erection of mills 32 & 35 A3 TENT OBRENOVAC 2006
  1. 82.  
Overhaul of reinforcement and servo drive B1-B2 TENT OBRENOVAC 2006
  1. 83.  
Dismounting of el. filter A1 TENT OBRENOVAC 2006
  1. 84.  
Overhaul  of el. filter in blok B1-B2 TENT OBRENOVAC 2006
  1. 85.  
Overhaul of mills 5 pcs A1 TENT OBRENOVAC 2006
  1. 86.  
Unit A 1-erection of new structure and equipment, erection RAFAKO made equipment as per special contract, delivery and erection of thermal insulation, for modificaiton and repair of ELECTRIC FILTER. TENT OBRENOVAC 2006
  1. 87.  
Block A 4 –overhaul of accessory boiler plants. TENT OBRENOVAC 2007
  1. 88.  
TENT-Unit A 4 – Dismounting of  the existing el. filter: steel structure, equipment and bearing steel structure, erection of new structure and equipment. TENT OBRENOVAC 2007
  1. 89.  
TENT B – Overhaul of el. filter on Block B1 & B2. TENT OBRENOVAC 2007
  1. 90.  
TENT B – Overhaul of reinforcement and el. filter of mech. servo drive on Blok B1 & B2. TENT OBRENOVAC 2007
  1. 91.  
TENT-A-Construction of tilted roof of spare parts & equipment store. TENT OBRENOVAC 2007
  1. 92.  
Overhaul of coal feeder plant. TENT OBRENOVAC 2008
  1. 93.  
Overhaul of reinforcement on Units B1&B2. TENT OBRENOVAC 2008
  1. 94.  
Overhaul of air mixture ducts in Unit B1&B2. TENT OBRENOVAC 2008
  1. 95.  
Overhaul of mill plant in Unit A1, A2, A3 & A5 TENT OBRENOVAC 2008
  1. 96.  
Overhaul of Boiler plantA1,2,3,5,6 Air ducts left. TENT OBRENOVAC 2008
  1. 97.  
Mechanical maintenance of coal feeders, ducts, air ducts, mill plants, scrapers. TENT OBRENOVAC 2008
  1. 98.  
Mechanical erection of ash handling system in TENT. TENT OBRENOVAC 2008
  1. 99.  
Overhaul of slag removal in Unit B1 TENT OBRENOVAC 2008
  1.  
A5 ESP equipment reconstruction in TENT. TENT OBRENOVAC 2008
  1.  
KOLUBARA METAL doo  Vreoci Erection of  5 drive stations TENT OBRENOVAC 2008
  1.  
“KOLUBARA METAL”d.o.o Vreoci.  Erection of runner boom TENT OBRENOVAC 2009
  1.  
Mill overhaul in A1 & A2 Block TENT OBRENOVAC 2009
  1.  
Overhaul of slurry channels in TENT B1 & B2 Blocks. TENT OBRENOVAC 2009
  1.  
A-6 Boiler overhaul TENT OBRENOVAC 2009
  1.  
Supply of A-6 block boiler cold bandages. TENT OBRENOVAC 2010
  1.  
Overhaul of mobile belts for grid burning on B1,B2. TENT OBRENOVAC 2010
  1.  
Dismounting of ESP within capital overhaul of Unit A6 TENT OBRENOVAC 2010
  1.  
Overhaul of mill in TPP Kolubara TENT OBRENOVAC 2010
  1.  
RAFFAKO S.A.- Mechanical erection of ESP in Unit A-6 TENT OBRENOVAC 2010
  1.  
Dismounting & erection of ESP floor on Unit A-6 TENT OBRENOVAC 2010
  1.  
Manufacture & erection of compensating rings within overhaul of Unit.A-6 TENT OBRENOVAC 2010.
  1.  
Works on ESP reconstr. in Unit A-6 TENT OBRENOVAC 2010
  1.  
Replacement of pipeline HDPE L-2 around trough II in ash depot TENT OBRENOVAC 2010
  1.  
Dismounting-erection on ESP in TENT-B2 TENT OBRENOVAC 2011
  1.  
Overhaul of conveyors in B1 & B2 TENT OBRENOVAC 2011
  1.  
Mech.erection of ESP B2-Rafako S.A. TENT OBRENOVAC 2011.
  1.  
Dismounting-erection works on chimney stack 3 DGS on mill A4 TENT OBRENOVAC 2011.
  1.  
Oil burners replacement in A1(12 & 15)  A2(24 & 24) TENT OBRENOVAC 2012
  1.  
TENT-B Reburning screen overhaul (DOOSAN POWER SYSTEM LIMITED) TENT OBRENOVAC 2012
  1.  
Regular & emergency mainten. of new ash handling system in TENT-B TENT OBRENOVAC 2012
  1.  
DGS mill overhaul in TENT-A 3 pcs TENT OBRENOVAC 2012
  1.  
Dism.mounting works on air mixture ducts in TENT-A TENT OBRENOVAC 2012
  1.  
Dismounting and mounting of VN electromotor TENT OBRENOVAC 2012