GOŠA MONTAŽA ad

90 godina iskustva je utkano je svuda oko Vas


Reference list of works conducted on furnaces

 

No

STRUCTURE

INVESTOR

YEAR

1.

Glass melting furnace in SFS

SFS Paraćin

1982.

2. Pusher type furnace

Sweden

1991.

3.

Reconstruction of fume ducts above the HF201 furnace

Oil Refinery Novi Sad

1998.

4.

Furnace for vacuum oil destilation

Oil Refinery Novi Sad

1998.

5. Furnace  BA  301 – 304

Oil Refinery  Pančevo

2000.

6. Furnace BA 101

Oil Refinery  Pančevo

2000.

7. Furnace 101

Oil Refinery  Pančevo

2001.

8. Disassembling of BA 201 furnace

Oil Refinery  Pančevo

2002.

9. Disassembling of HF furnace

Oil Refinery Novi Sad

2002.

10. Overhaul of furnace BA-2201 A/B.

Oil Refinery  Pančevo

2006.

11. High furnace overhaul.

US Steel Smederevo

2005.

12. Replacement of filling device in High furnace plant

US Steel Smederevo

2005.

13. Desing and manufacture of crane access road and pedestrian gallery around crane tracks BF 31- Blast furnace

US Steel Smederevo

2006.

14. KIA DOO – Nitrogen line erection on blast furnace

US Steel Smederevo

2007.

15. Replacement of furnace burner parts.

TITAN „KOSJERIĆ Cement Plant” A.D.

2007.

16. Production, delivery, and installation of stucture and fan for furnace wall cooling.

TITAN „KOSJERIĆ Cement Plant” A.D.

2007.

17. Production, delivery, and installation of clinker conveyor parts.

TITAN „KOSJERIĆ Cement Plant” A.D

2007.

18. Welding on furnace plant.

TITAN „KOSJERIĆ Cement Plant” A.D.

2007.

19. Production, delivery, and installation of equipment and parts for replacement of clinker bucket conveyor.

TITAN „KOSJERIĆ Cement Plant” A.D.

2007.

20. Preparatory works on VP-2.

US Steel Smederevo

2010.

21. Replacement of filling device VP2.

US Steel Smederevo

2010.

                                                                                                                               METALLURGICAL EQUIPMENT 

The Metallurgical Equipment Program has been implemented since 1950. For the requirement of the steel mill Zenica, GOŠA has undertaken the installation of a mixing plants, ground level charging machine, monorails, rocking type furnace. As many as 35000 tons of the equipment have been installed in various facilities of Smederevo Metallurgical Works, including anealing plant, dresser, rolling station, shears, converters, buggy conveyer equipment slitting shears, blast furnaces.

For only 18 months, GOŠA’s erection team has completed a blast furnace in Smederevo Metallurgical Works, volume 1386 cum, capacity 865.000 t. where 6000 tons of equipment and 7000 t of structure has been installed.

 EXPERIENCE ON PROJECTS ABROAD 

  • Bangun – Central African Republic

           OMIH sports hall

  • Addis Abeba – Ethiopia

           Exhibition hall

  • Saudi Arabia – Dammam

           Grain silo – 20 bins

  • HE „BOALI II“ – CAR

           Intake structures, pipelines and gates

  • CHIRA PIURA – PERU

           Pipelines, gates and linings

  • DAR – ESSALM – TANZANIJA

           portal crene  for port 20/7/14/30,5 

  • TRIPOLI – BENGAZI –LIBYA

           Dapartment stores 3 pcs

  • VLAŠKI MEZIRIĆI – ČSSR

           Colour TV factory

  • AL IBTISSAM DAM

           Algeria HNO

  • MOSCOW – RUSSIA

           Exhibition hall

  • Seni Amrame

           Algeria HN 

  • Zastakljena Al-fasada

       Mongolija

  • Fabrika zeolita

       Talin

  • Potisna peć

      Švedska

 Fabrika SIPOREX-a

     Samara

  • Fabrika lizina

     Obuhov

  • Fabrika margarina

      Kazanj