Repair of the destroyed Sava Bridge
After the end of WWII, in 1945, over 2,000 tons of steel construction were retrieved from the river Sava, and the venture itself is considered to be the beginning of the GOŠA MONTAŽA era.
Repair of the destroyed Sava Bridge
After the end of WWII, in 1945, over 2,000 tons of steel construction were retrieved from the river Sava, and the venture itself is considered to be the beginning of the GOŠA MONTAŽA era.
Goša Montaža posluje kroz integrisani sistem menadžmenta koji je sačinjen od Sistema upravljanja kvalitetom prema standardu ISO 9001, Sistema upravljanja zaštite životne sredine prema standardu ISO 14001 i Sistema upravljanja bezbednošću i zdravlja na radu prema standardu ISO 45001.
Kompletan proces od projektovanja do montaže usklađen je sa normama EN 1090-2, a zavarivački radovi sa normama EN ISO 3834-2.
Knićaninova 3, Beograd, Srbija
Sedište: +381 11 303.58.33
Uprava: +381 26 317.126
montaza@gosamontaza.rs
www.gosamontaza.rs
Copyright © GOŠA Montaža • Web by Agencija Kraguljac